Replacing a 3-Phase Filter in the Side Compartment 3-Phase Power Distribution Unit
- Updated2025-12-16
- 2 minute(s) read
Replacing a 3-Phase Filter in the Side Compartment 3-Phase Power Distribution Unit
- Power off the ATE Core Configurations Generation 2 by flipping the main disconnect branch breaker to off.
- If your ATE Core Configurations Generation 2 utilizes a UPS to provide backup power, press the power button on the UPS to power it down.
- Disconnect the ATE Core Configurations Generation 2 from facility power.
| Shipping Kit Part Number | Description |
|---|---|
| 789496-01 | 3-Pole 3-Phase Filter |
This procedure only applies to ATE-38U, ATE-44U, and ATE-38E racks.
Equipment
- 3 mm hex key
- T20 Torx head screwdriver, 1.30 N · m (11.5 in. · lb)
- T30 Torx head screwdriver, 6.00 N · m (53.1 in. · lb)
- Remove the left side panel of the ATE Core Configurations Generation 2 using the 3 mm hex key.
- Unscrew the four screws to remove the hinge bracket cover using the T20 Torx head screwdriver.
-
Locate the 3-Phase filter.
- 3-Pole 3-Phase filter
- Disconnect the cables connected to the 3-Phase filter using the T30 Torx head screwdriver,
-
Unscrew the four screws which mount the 3-Phase
filter to the hinge bracket using the T30 Torx head screwdriver.
- Install the new 3-Phase filter to the hinge bracket using the T30 Torx head screwdriver.
- Reconnect all cables to the new 3-Phase filter using the T30 Torx head screwdriver. Refer to the label on the hinge bracket cover for wire connection information.
- Screw in the hinge bracket cover using the T20 Torx head screwdriver.
- Reinstall the left side panel of the ATE Core Configurations Generation 2 using the 3 mm hex key.