Connecting the Hardware for PAE Measurements
- Updated2024-12-03
- 1 minute(s) read
Connecting the Hardware for PAE Measurements
Complete the following steps to set up your hardware to perform PAE measurements.
- Connect the HI port of the SMU to the VDC port of the DUT.
- Connect the LO port of the SMU to the GND port of the DUT.
- Connect the RF OUT (or IF IN/OUT 0) port of the vector signal transceiver (VST) to the RF IN port of the DUT using an SMA cable.
-
Connect the RF IN (or IF IN/OUT 1) port of the VST to the RF OUT port of the DUT using
an SMA cable.
Figure 1. Connecting for Power-Added Efficiency Measurements
Related Information
- System Requirements
Power-Added Efficiency Measurement Library has the following requirements:
- PXIe-1095 User Manual
- PXI-4130 Features
- PXIe-4137 User Manual
- PXIe-4139 User Manual
- PXIe-5831 User Manual
- PXIe-5841 User Manual
- PXIe-5842 User Manual