Connecting the Hardware for Power-Added Efficiency Measurements

Perform the procedure in this section when setting up your hardware to perform power-added efficiency measurements.

Refer to the hardware requirements listed in Power-Added Efficiency Hardware Requirements. Ensure all modules are installed in the chassis before completing the following steps.
  1. Connect the OUTPUT port of the hardware to the input power port of the DUT.
  2. Connect the RF OUT or IF IN/OUT 0 port of the vector signal transceiver (VST) to the input port of the DUT using an SMA cable.
  3. Connect the output port of the DUT to the RF IN or IF IN/OUT 1 port of the VST using an SMA cable.